TotalVac Solutions
Request Service Call (437) 908-2330

7:00am to 9:00pm, seven days a week

SITE DEWATERING

Standing water removed so work can continue.

TotalVac supports approved dewatering needs where standing water can be safely reached by vacuum hose and handled through an accepted discharge or disposal route. Each request is reviewed for water quality, volume, access and handling requirements before it is scheduled.

WHAT THIS SERVICE DELIVERS

Benefits

  • Standing water removed from accessible areas so work can restart
  • Water quality, sediment and access reviewed before scheduling
  • Volume and hose reach matched to the equipment
  • Clear notice when a discharge or disposal route is not available
  • Coordination around active site conditions

Who it is for

Site supervisors, trades and facility teams who need water cleared from a work area before the next stage of work.

Common signs service is needed

  • Water is sitting in an excavation, pit or low point
  • A work area cannot be accessed safely until the water is removed
  • Water has collected in a mechanical room or service area
  • Rainfall or a leak has left more water than a small pump can clear
  • An inspection or pour is scheduled and the area must be dry
Technician removing standing water from an excavation on a construction site with a vacuum hose

Applications

  • Excavation water
  • Utility pits
  • Construction low points
  • Flooded service areas
  • Mechanical rooms
  • Exterior sumps

Dewatering availability depends on water quality, sediment, contamination risk, access, volume, and local discharge or disposal requirements.

SERVICE PROCESS

Four steps, start to finish.

  1. Describe the water and the site

    Share the location, approximate volume, how the water collected, and anything visible such as sediment, sheen or odour.

  2. Confirm handling

    TotalVac reviews water quality, access, volume and the available discharge or disposal route before accepting the work.

  3. Remove the water

    The crew sets up at the approved access point and removes the approved water from the accessible area.

  4. Confirm the area

    The work zone is checked and completion is confirmed so the next stage of work can proceed.

BEFORE THE CREW ARRIVES

Site preparation checklist

A few minutes of preparation keeps the visit short and the work clean.

  • Keep the access route clear for the hose and vehicle
  • Identify the safest position for the equipment
  • Share known contamination, sheen or unusual odour before arrival
  • Confirm site check-in, orientation or permit requirements
  • Tell TotalVac about any live work happening nearby

What to send with the request

  • Where the water is and how it collected
  • Approximate volume and depth
  • Visible sediment, sheen, odour or suspected contamination
  • Access route for the hose and vehicle positioning
  • How soon the area needs to be clear

Start a request

SERVICE QUESTIONS

Site Dewatering questions

No. Availability depends on water quality, sediment, contamination risk, access, volume, and local discharge or disposal requirements. Each request is reviewed before it is scheduled.

Tell us what you see, including sheen, colour, odour or nearby chemical storage. Do not assume the water is clean. TotalVac will review the information before accepting the request.

This service covers vacuum removal visits. Ongoing pumping arrangements would need to be discussed and confirmed separately.

Need it pumped out? Start here.

Send the location, service type, access details, and urgency. TotalVac will review the request and follow up with the next step.

Call now Request Service